Finished packaging cartons staged for shipment before the Chinese New Year holiday

Order planning · October 29, 2026

Chinese New Year 2027: plan packaging orders En arrière.

Chinese New Year 2027 falls on Saturday, February 6. Custom packaging that must ship before the holiday needs final artwork, an approved sample and booked materials well before factories slow down.

HolidayFeb 6, 2027
OuvragesFinal first
ÉchantillonApproved early
PickupConfirmed in writing

Réponse courte

Ship before the slowdown, not before the holiday date.

Chinese New Year 2027 is on February 6, 2027. Packaging factories typically slow down in the weeks before the holiday as staff travel home, close for the holiday period, and return to full capacity gradually afterwards. The date that matters for your order is therefore the supplier's last pickup day, not February 6.

Ask every supplier, in writing, for four dates: last production day, last pickup day, reopening day and expected full-capacity day. Then plan your artwork, sample and production backward from the last pickup day.

Boundary: mainland China announces its official holiday arrangement separately, and each factory sets its own closure. This guide gives the planning method; confirm actual dates with your supplier and forwarder.

1 · Work backward

The pre-holiday packaging timeline.

Each milestone has to be finished before the next can start. Replace the durations with the lead times your supplier quotes for your exact box, finish and quantity.

Faites défiler horizontalement pour afficher toutes les colonnes →

Milestones for custom packaging that must ship before Chinese New Year 2027.
ÉtapeMust be donePourquoi c'est important
Artwork, dieline and structure finalBefore the sample is madeEvery later step waits on approved files; a late artwork change restarts sampling.
Pre-production sample approvedBefore bulk materials are cutColour, fit, insert and finish are locked while the factory is still at full capacity.
Materials and special components bookedAt sample approvalSpecialty paper, magnets, foil, ribbon and inserts can run short before the holiday.
Bulk production and QC completeSupplier’s quoted production time before the last pickup dayAsk for the quoted working days in writing, plus inspection and packing time.
Last pickup or ex-factory dateConfirmed by supplier and forwarderFreight space and trucking tighten in the weeks before the holiday.
Restart and full-capacity dateConfirmed in writingProduction often resumes gradually; plan reorders and launches around full capacity, not the first working day.

Retenez la plus précoce de deux dates : le dernier enlèvement confirmé par le fournisseur et le transitaire, ou la réception requise en entrepôt moins tout le délai de livraison et la marge. Remontez ensuite le contrôle qualité, la production, les matières, le transport d’échantillon, la validation et les fichiers. Utilisez le lead time planner to calculate your own dates from the quoted durations.

Packed export cartons ready for pickup ahead of a factory holiday

2 · Reduce holiday risk

Five ways to protect a launch around Chinese New Year.

  • Freeze artwork earlyDes modifications tardives du texte, du code-barres ou des couleurs peuvent exiger une nouvelle épreuve ou un nouvel échantillon et un calendrier révisé.
  • Approve one physical sampleLock board, wrap, finish, insert and colour target on a signed sample before the factory slows down.
  • Book materials with the orderSpecialty papers, magnets, ribbons and foils can sell out before the holiday; confirm they are reserved.
  • Split the order if neededShip a smaller pre-holiday batch for launch and schedule the balance for after full-capacity restart.
  • Hold buffer stockCover the closure plus the slow restart weeks, especially for packaging tied to Valentine's Day or spring launches.

Agree the delivery basis early too: see the EXW, FOB, CIF and DDP guide for who books freight in each case.

3 · Send this now

What to send your supplier this week.

A complete brief lets the supplier confirm whether your order can still ship before the holiday.

  1. 01

    Product and box details

    Box style, internal size, product weight, insert, quantity per SKU and number of SKUs.

  2. 02

    Artwork status

    Final or draft artwork, dieline status, Pantone targets, foil and embossing areas.

  3. 03

    Required date

    Date the packaging must arrive, destination and preferred delivery basis.

  4. 04

    Ask for the four dates

    Last production, last pickup, reopening and full-capacity dates, confirmed in writing. Use the Modèle RFQ to keep quotes comparable.

Questions de l'acheteur

Chinese New Year packaging FAQ.

Closure dates vary by factory and region; always confirm them with your supplier.

Vérifiez séparément le calendrier et les dates commerciales.

Les jours ouvrés ne sont pas des jours calendaires. Convertissez chaque étape selon le calendrier de travail et les fermetures du fournisseur responsable avant de la saisir dans le planificateur.

Observatoire de Hong Kong : calendrier lunaire 2027. Informations sur l’entreprise et les commandes.

Boîtes en papier sur mesure : minimum de 1 000 par modèle ; échantillons en environ 7 jours ouvrés ; production en 25–35 jours ouvrés après approbation. Transport séparé. Autres composants et formats complexes : devis spécifique.

Feuille de calendrier

Attribuez une date confirmée et un responsable à chaque jalon.

Téléchargez le CSV vierge en anglais, renseignez les dates et hypothèses avec votre fournisseur et transitaire, puis collez les jalons clés dans votre demande. Un champ vide reste non confirmé ; cette feuille ne réserve ni capacité ni transport.

Ordering before the holiday?

Ask us whether your packaging can still ship before Chinese New Year.

Send the box style, size, quantity, artwork status and the date you need the packaging. We will reply with the dates we can confirm for sample, production and pickup.

Démarrer un devis d'emballage